Bid Opportunity Details
|
If documents are available they will be in
PDF format and will open in a new window.
(If your PDF screen is blank use the 'refresh' button to reload it)
|
[ Return to Bid page ]
|
| Saanich Pump Station Upgrades
|
| Number |
Closing Date |
Status |
| T 07/09 |
Sep 28, 2009, 3:00 pm |
Awarded |
| Details: |
This Contract includes Works to be constructed at three water pump stations, Old West Saanich, Maplewood, and Hartland. Old West Saanich includes construction reinforced concrete pump station, mechanical and electrical work including installation of an Owner-supplied diesel generator set. The Maplewood pump station work includes replacing two duty pumps and upgrading the electrical equipment. The Hartland site involves the installation of an Owner-supplied diesel generator set to the existing pump station including the associated electrical work.
Tender Documents and Drawings can be picked up at the Office of Purchasing Services with a refundable deposit of $100.00 per set. (Note - Drawings are not set up in PDF format and are not online). If you wish to obtain a copy of the disc with your tender package, please contact the Office of Purchasing Services,@ 250-475-5494, local 3481 to make arrangements.
Tender documents and drawings will be for viewing only at the Construction Associations.
Attendees at Site Visit September 10th:
Rocky Point Metalcraft; Plad Equip; Raylec Power; Northridge Equip; Kinetic; Emery Electric; Brunnell; Savage Kohut Electrical; Apex Steel & Gas; York Excavating; HCW Welding; Ridgeline Mechanical; Saanichton Developments; C-1 Contractors; G & E Equipment; MPC Consulting |
| Site Visit: |
Mandatory Site Visit: Thurs, September 10, 2009 @ 10:00 am |
| Addendums: |
Addendum No. 1
Addendum No. 2
Addendum No. 3 |
| Bid Manager: |
Wendy May |
| Documents: |
Documents no longer available
|
| Awarded To: |
Brunnel Construction Limited |
Addendums
Any and all addendums to this bid opportunity will be posted here
on our web site. It is the sole responsibility of participants to
make sure that they are in receipt of all addendums prior
to Tender closing.
To acknowledge receipt of each addendum, each addendum number issued
must be noted in the participant’s submission, with a signature
of an authorized representative of your organization, as being received.
|