Heritage:
Estimate Checklist
|
|
Use the Estimate Checklist to help you decide on the requirements
for your project.
FOUNDATION
- Type, quality of mortar or concrete, colour
- Drainage - perimeter and storm drains
- Water/weather sealer
- Ventilation
- Skirting details
- Unforseen rot/repair (ask contractor to indicate on Estimate
Sheet the hourly rate for this)
GUTTERS AND DOWNSPOUTS
- Material, type, colour, style, gauge
- Fastening system (ie. nails, screws, spacings)
- Connection to drainage system
- Connection seals/covers
- Repair rot/damage to fascia boards or rafter tails
- Storm drain condition
- Gutters adjusted to drain toward downspouts
- Unforseen rot/repair (ask contractor to indicate on Estimate
Sheet the hourly rate for this)
ROOF
- Tear off/preparation (remove all old roofing)
- Repair damaged strapping or roof sheathing
- Unforseen rot/repair (ask contractor to indicate on Estimate
Sheet the hourly rate for this)
- New roof material
- Shingles - type, grade, untreated or preservative treated
- Ridge, capping type, other (description)
- Valleys and flashing (material, colour, gauge)
- Rafter tails, eaves, barges, soffits (repair replace material,
type)
- Placement of vents (as per Building Code) number, colour,
material
- Eave - check nail lengths to avoid protruding under eave
- Warranty - minimum 10 years
CHIMNEYS AND MASONRY
- Type, style, colour
- Mortar - type, style, colour
- Ties, strapping, bracings, reinforcement
- Water/weather sealer
RE-CHIMNEYS
- Type, liners, protrusion
- Finish capping, type, style, sealer, chimney pots
- Bricks to match original
- Insulation - air space (if applicable)
- Unforseen rot/repair (ask contractor to indicate on Estimate
Sheet the hourly rate for this)
EXTERIOR WOODWORK TRIM
- Wood quality, type, kiln dried, profile match, mouldings
- Fastenings (ie.) glue nails, screws
- Back priming wood before installation
- Unforseen rot/repair (ask contractor to indicate on Estimate
Sheet the hourly rate for this)
- Preparation and finish
PAINTING
- Detailed surface preparation (ie.) priming, cleaning process,
repairs
- Paint brand, type - oil, latex
- Number of coats
- Warranty
|